1

Manufacturers - HUD Code Homes

#FFFFFF
#FFFFFF

Salesforce Login Information

Current registered Manufacturers, Sellers, Installers, or Inspectors of factory built structures can access Salesforce using the below link. New applicants should visit the appropriate page for their account type, follow the provided instructions, and submit a registration application. Upon successful entry into the system, login information will be sent to you.

Salesforce Link

#FFFFFF

The Division of Housing must conduct a full design and plan review and inspection of the construction of HUD homes to the extent the design and construction relates to work performed offsite or work that is completed onsite using components shipped with the HUD home as reflected in the approved plans ONLY when there is a HUD Manufacturer within the State of Colorado. A local government cannot review or approve the construction of a HUD home. Additionally, local governments cannot charge building permit fees to cover the costs of the Division's reviews or inspections.

A local government's jurisdiction is limited to work done onsite in compliance with section 24-32-3311(6), C.R.S., and includes associated plan review, permits, inspections, and fees.

The Division of Housing may authorize a local government to inspect and approve work that is completed onsite using components shipped with the HUD home as reflected in the approved plans for the factory-built structure. If authorized, a local government may charge inspection fees to assist the Division of Housing to inspect and approve work that is completed onsite using components shipped with the factory-built structure as reflected in the approved plans for the HUD home.

Construction Requirements

For the State of Colorado, HUD manufactured homes must comply with the following design criteria at a minimum to be eligible for sale, installation and construction for the State.

State of Colorado Minimum Design Criteria for HUD Construction

  • Wind Zone: Zone 1
  • Thermal Zone: Zone 3
  • Roof Load Zone: Middle Zone (30psf)

If the structure does not meet the minimum design criteria, it can not be placed in the State of Colorado.

Registration

Plan Submission

Inspection Scheduling

To schedule inspections for in-plant and on-site inspection for modular structures, please contact the FB/FBNR Coordinator at dola_manufacturedbuildings@state.co.us

Reference Guides

Third Party Inspection Agencies

If you are a third-party agency seeking approval to conduct a variety of inspections and reviews on the behalf of the Division of Housing, please review the Administrative Rules 8 CCR 1302-14, Rules 4.30 through 4.33. Submit required information in rule to the FB/FBNR Program Coordinator at dola_manufacturedbuildings@state.co.us.

#FFFFFF

Was this content helpful?